Talk directly to the engineering and sales team that builds your sensors. No automated forms, no overseas call centers — direct access to the people at our Northridge facility.
For standard products, call us — we can often quote over the phone and have assemblies shipped the same day. For custom or aerospace orders, email a drawing or specification and we will respond with a formal quote within 24 business hours.
| For RTD Sensors | For Thermocouples |
|---|---|
| Element type (Pt100/Pt1000) | Thermocouple type (K/J/T/E/N/R/S/B) |
| Accuracy class (A, B, AA) | Tolerance class (Std / Special Limits) |
| Wire configuration (2/3/4-wire) | Junction style (grounded / ungrounded) |
| Sheath OD and material | Sheath OD and material |
| Insertion / immersion length | Insertion / immersion length |
| Process connection type | Process connection type |
| Lead wire type and length | Extension wire type and length |
| Calibration cert required? | Calibration cert required? |
| FAIR / C of C required? | FAIR / C of C required? |
| Quantity and delivery | Quantity and delivery |
| Product Type | Standard Lead Time | Notes |
|---|---|---|
| Standard Thermocouple Assembly | Same day – 1 business day | Most common types and configurations in stock |
| Standard RTD Assembly | 1–2 business days | Pt100 / Pt1000 standard configurations |
| MIMS Thermocouple Assembly | 2–3 business days | Cut-to-length, straight or simple form |
| Complex Formed MIMS Assembly | 3–5 business days | Multi-bend, custom geometry |
| Machined Thermowell (stock material) | 3–5 business days | Threaded or flanged, standard materials |
| Machined Thermowell (special material) | 5–10 business days | Subject to material availability |
| Aerospace / FAIR-Required | Quoted individually | Dependent on documentation requirements and complexity |
| Repair & Recertification | 3–5 business days | Depending on workload and inspection requirements |
Talk directly to the engineering team that builds your assemblies. No bots, no call centers.